Northside Hospital | Forsyth Patient Tower

Northside Hospital partnered with Array to advance a master plan for its growing Forsyth campus, adding a six-story patient tower, strengthening hospital connections, and expanding critical care capacity.

No items found.
01
Quick Facts
Location
Cumming, GA
Facility Size
273,708 SF (new construction) + 56,189 SF (renovation)
Project Type
Campus Master Plan Implementation
Client
Northside Hospital
Completion
Master Plan: April 2023 | Implementation Projects (Est.): August 2028
Services
Planning, Architecture, Interior Design
02
The Story

With one of the fastest-growing populations in the country, Northside Hospital Forsyth needed a clear strategy to expand while preserving its strong identity and operational integrity. Array led the development of a campus-wide master plan that emphasized continuity, clinical excellence, and patient-centered growth.

Rather than replacing what was already working, the plan focused on enhancing the strengths of the existing campus. A new six-story patient tower, surgical suite expansion, renovated ED, and intuitive wayfinding upgrades were all designed to align with current operations. These updates maintain consistency in access and circulation while enabling future growth.

The project not only increases patient capacity and supports service line expansion—it also reflects Northside’s enduring commitment to resilient infrastructure, clinical precision, and a healing environment rooted in the needs of its community.

03
Key Features

New Six-Story Patient Tower:

  • 273,708 SF new addition
  • 56,189 SF of renovations
  • Includes med/surg, ICU, and intermediate care beds
  • Connected to the existing surgical tower

Emergency Department Expansion:

  • Full renovation and additional ED entry

Central Sterile Processing Department:

  • New construction for sterilization and support functions

Surgical Support Spaces:

  • Expanded operating suites and prep areas

Unified Entry & Lobby:

  • Redesign improves wayfinding and strengthens the patient experience

Infrastructure Enhancements:

  • 460-space parking garage
  • 24,600 SF central energy plant for resilience
  • 18,235 SF pharmacy aligned with USP 797/800 compliance
05
Testimonials
"Our project was highly complex, requiring a multi-phase implementation. The Array team navigated it seamlessly, simplifying the process while engaging our clinical user group with professionalism and care. Their expertise and dedication made a significant, positive impact."
Carlos Washington
Sr. Director of Facilities Management - Northside Hospital
06
Collaborators
Anchor Planning
Batson-Cook Company
Forest N. Hibbard - PE - LLC
HERA Laboratory Planners
HRD
Long Engineering
Newcomb & Boyd
Wallace Design Collective
White Top Aviation